Documents
Final Report (posted 08-03-09)
- Cover
- Table of Contents
- Executive Summary
- Section 1 - Preferred Recommendations
- Section 2 - Implementation Plan
- Section 3 - Financial Plan
- Appendix A - References Cited
- Appendix B - Project Timeline
- Appendix C - Public Comments
- Appendix D - Recommendation Plan (4 MB)
- Appendix E - Right of Way Impacts (2 MB)
- Appendix F - Construction Cost Estimates
- Appendix G - National Transit Summary
- Appendix H - Updated APA in Manchester
- Appendix I - Public Comments
Separate Connecticut Department of Transportation Project (posted 04-22-09)
Draft Technical Memorandum #1 (posted 03-14-07)
- Cover
- Table of Contents
- Section 1 - Introduction (2.1 MB PDF)
- Section 2 - Existing Transportation System Conditions (6.5 MB)
- Section 3 - Future No Build Conditions ( 2.1 MB PDF)
- Section 4 - Existing Natural, Cultural and Socioeconomic Conditions ( 53 MB PDF)
Due to the large file size, readers are encouraged to right-click the link above and choose the "save target as..." or "save link as..." command and save the PDF file to your computer. Macintosh users should CTRL-click the link and save the file to their computer.)
The following three Technical Memorandums are currently under review by the Study Advisory Committee and will be uploaded to the website soon. Stay tuned!
Draft Technical Memorandum #2: Future Conditions Report – Roadway Alternatives
- Cover
- Section 1 - Introduction
- Section 2 - Sceerning of Alternatives
- Section 3 - Future Performance of Preferred Alternatives
- Appendix A - Preliminary Roadway Alternatives (3.5 MB)
- Appendix B - Matrix Description of Modified Concepts
- Appendix C - Local Road Concepts
- Appendix D - Screened Roadway Alternatives (13 MB)
- Appendix E - Interchange Studies at Pleasant Valley Road (17 MB)
- Appendix F - Redstone Road Extension Studies (37.5 MB)
- Appendix G - Preliminary Alternatives Evaluation Matrix
- Appendix H - Technical Work Group and AC Meeting Minutes
- Appendix I - Public Informational Meeting Minutes
- Appendix J - Screening Matrixes
- Appendix K - SYNCHRO Output
- Appendix L - LOS for Optimized Preferred Alternatives (22 MB)
Draft Technical Memorandum #3: Transportation systems Management / Transportation Demand Management, Transit, Bicycle and Pedestrian Alternatives
- Cover
- Section 1 - TSM/TDM
- Section 2 - Transit Alternatives
- Section 3 - Bicycle and Pedestrian Alternatives
- Appendix A - References Cited
- Appendix B - Exhibits of Bicycle and Pedestrian Facilities (45 MB)
- Appendix C - Bike Lane Design Guidelines


